能源 · 新闻详情
German grid operator dispute limits battery use at new solar-storage hybrid plant
真正值得关注的不是PV Magazine这一条动作本身,而是它可能把「光伏」的竞争焦点推向更大范围的连锁反应。
发生了什么:Grid operator Eon Edis has withdrawn previously agreed import capacity for a newly opened 69 MW solar-plus-storage plant in northeastern Germany, limiting its 76.5 MWh battery to s…
为什么重要:它提示了一个值得继续跟踪的变化方向。
观察窗口:接下来观察它是否会引发更多同类动作,以及影响范围能否扩大。
正文来源:非原文:源网页正文只有单句或图片说明,以下为已有摘要与自动整理内容
原文链接:https://www.pv-magazine.com/2026/09/19/german-grid-operator-dispute-limits-battery-use-at-new-solar-storage-hybrid-plant/
原文链接:https://www.pv-magazine.com/2026/09/19/german-grid-operator-dispute-limits-battery-use-at-new-solar-storage-hybrid-plant/
Grid operator Eon Edis has withdrawn previously agreed import capacity for a newly opened 69 MW solar-plus-storage plant in northeastern Germany, limiting its 76.5 MWh battery to storing only power generated on-site.
The post German grid operator dispute limits battery use at new solar-storage hybrid plant appeared first on pv magazine Global.
机器翻译/自动整理可能存在误差,请以原文为准。
继续阅读
正在加载推荐…